WHATSAPP +86 17328778846
info@henyopetro.comLocation: Saudi Arabia
Application: Oil & Gas Drilling Operations
Equipment Supplied: 970GPM Mud Purification System
Project Overview
Henyo Petro has successfully delivered a 970GPM mud purification system for an oilfield drilling project in Saudi Arabia, providing an efficient solution for drilling fluid treatment and solids removal.
The complete unit was professionally engineered, manufactured, assembled, tested, and inspected under strict quality control procedures to ensure reliable performance and successful delivery to the project site.

Delivered Mud Purification System Configuration
The delivered 970GPM mud purification system integrates multiple solids control technologies, including:
Shale shaker
Desander hydrocyclone system
Desilter hydrocyclone system
Mud tanks
Mud agitators
Sand pumps
Mud mixing system
Electrical control system and supporting equipment
Through multi-stage separation processes, the system effectively removes unwanted solids from drilling fluid and maintains stable mud performance during continuous drilling operations.
Technical Advantages of Henyo Petro 970GPM Mud Purification System
High-Capacity Processing Performance
With a processing capacity of 970GPM, the system is designed to meet high-volume drilling fluid treatment requirements for demanding oilfield applications.
Integrated Multi-Stage Solids Control
The combination of shale shaker, desander, and desilter technologies provides efficient solids removal across different particle sizes.
Improved Drilling Fluid Recovery
By separating drilled solids from valuable drilling fluid, the system helps reduce mud replacement costs and minimize waste discharge.
Reliable Operation in Harsh Environments
Robust structural design and reliable components ensure stable operation, long service life, and reduced maintenance requirements.
Consultation
Online